Wednesday, August 3, 2011

Lots and Lots of Progress!

We have wood floors:
Transition between the hallway and front bedroom.  This is the same flooring but the reddish one was finished and the other one was not.

Front bedroom

Middle Bedroom and hall - again all the same would, just lack of polyurethane

Closet with fancy rift cut wood instead of quarter sawn Rift vs. quarter sawn vs. plane cut

Kitchen floors

Master Bedroom
We also have some tile (as of yesterday):
The top sheet is for the laundry room floor and the bottom for the bathroom floorss

The showers will be the white subway tile with a  beauty stripe of the square tiles

The laundry floor!
Here are some doors and trim:
Bedroom Door

And another bedroom door

Close up of the trim and moulding

Pantry doors and the hot water closet
And finally - Kitchen Cabinets (less one oven cabinet which arrived damaged and is being replaced):
The oven cabinet will be to the left of the wall cabinets above


Island with its open shelf corner - to display my dust collection!

No comments:

Post a Comment